Mar1990
                                To
Jul 1992Irbid - Jarash - Amman Highway - Section 2
A dual carriageway with two lanes.
The work carried out:
- 5.8 million cubic meters unclassified excavation by blasting.
 - 3.7 million cubic meters of fill
 - 40 thousand cubic meters of concrete.
 - 300 thousand ton of hot asphalt.
 - Pre-stressed Bridge with two 26 meters  span
Value of this Project 22 Million USD 